Ross Town Center Culvert Replacement

Ross Town Center Culvert Replacement

General Contractor – Civil and Environmental Consultants

Project Size – Remove / Re-Install 120’ 72” Reinforced Concrete Pipe

Architect – Civil and Environmental Consultants

Project Cost – $245,814.82

AEI’s services: sawcut existing asphalt, remove existing guide rail system, remove existing sign, replace the 72” pipe, asphalt, guide rails, and rehabilitate the remaining concrete pipe.

Civil and Environmental Consultants contracted AEI to replace 120 feet of one 72 inch reinforced concrete pipe under a McKnight Road intersection and rehabilitate the remaining length of the 72 inch pipe that extends through a parking lot. In addition to our work with them on this job, we are currently consulting with Civil and Environmental Consultants on another bid and look forward to continuing that relationship for years to come.